Closing Checklist (Russellville Location)

Russellville Closing Checklist

Facility Checklist

Place Blue Cones in Main Drive Lane 5 Minutes AFTER Closing Time *
Ensure NONE of the Vacuum Lanes Are Clogged (DO NOT LEAVE CLOGGED FOR OPENERS) *
Sweep Vacuum Lot/Throw Away All Visible Debris *
Empty BUILDING SIDE Vacuum Cyclones into Trash Cans on Mon, Wed, Fri *
Empty FAR SIDE Vacuum Cyclones into Trash Cans on Tue, Thur, Sat
Empty ALL Trash Cans in Dumpster *
Place Towel Cart and Blue Towel Bin In Equipment Room and Restock for Openers *
Raise Gates to Pay Stations on Digital Queue by Selecting "OPEN" *
Retrieve Keys to SPS from Cash Drawer and Lock SPS #1 & SPS #2 *
Take Sales Attendant Tool Box to Office *
Place Keys to SPS Back In Bottom of Cash Drawer *
Maximum upload size: 1.54MB

Tunnel Checklist

Turn Knobs for VAC #1 and VAC #2 on the MCC to OFF (Green Light Should Go Off) *
Shut Off Light Blue Air Supply Valve Above and to the Right of the 3 Tank Mixing Station *
Thoroughly HP Spray Tunnel Floors, Equipment, Walls Starting From Entrance of Tunnel towards the Exit (Be Sure to Spray Underneath Tire Brushes & Wraps) *
Empty Soap Buckets on DS & PS Into Pit and Store Inside Tunnel with Brushes *
Close Tunnel Exit Airlift Door *
Close Tunnel Entrance Airlift Door *
Turn Off ALL Tunnel Lights and Equipment Room Lights *
Shut Off Black Water Supply Valve For Mat Washer
Shut Off Red Valve on Both Air Compressors
PRESS RED E-Stop Button On MCC to Power Down Wash (VERY CRUCIAL DO NOT FORGET TO DO THIS) *

Final Closing Steps

Ensure the Following Doors Are LOCKED *
Clock-Out Using Front Lobby POS *
Exit Thru Office Lobby Area Door and Ensure Door is Locked *