Opening Checklist (Glasgow Location)

Glasgow Opening Checklist

Facility Checklist

Lot Inspection Upon Arrival (Walk around building & ensure closers left site in proper condition) *
Unlock Essential Doors for Operations *
Ensure Lot is Clear of Trash and Debris *
Place All Trash Cans in Position *
Place Blue Cones in Position in Each Lane *
Flip Breaker Switch on VAC 1 & VAC 2 to Power On *
Place Fully Stocked Towel Cart in Position on Lot *
Place Sales Attendant Tool Box in Position at SPS *
Using Leaf Blower, Please Blow All Debris Over The Hill Starting At Tunnel Entrance Concrete Pad & Continuing On To Both Pay Station Lanes
Turn water on to mat washing machine and test to make sure water is running through it.
Turn on red switch at air compressor in laundry room & turn ball valve to open that runs to blue air lines in parking lot. Test blue air lines to make sure air is moving through it.
Open Doors on SPS and Secure in Open Position *

Tunnel Checklist

Open Both Entrance & Exit Doors and Turn on ALL Lights *
Check Salt Level At Water Softener Bin & Add Salt If Water is Above Salt Level. Add Salt Until it Is above water level.
Pull RED E-Stop Knob on MCC to Power Tunnel *
Turn VAC 1 & VAC 2 Knobs on MCC to AUTO (Green Light Should Turn On) *
Open Valve on Bottom of Compressor to Release Built-Up Moisture (Drain Until No Water Runs Out) *
Open Water Valves to the Following: (VERY CRITICAL IF UNSURE CALL MOD) *
Open Air Regulator for 3 Tank Mixing Station to 100 PSI *
Inspect All Prep Lines (Yellow, Orange, Blue) for Leaks While in Use *
Ensure Conveyor Grates are in Proper Position (Rough Side Up) *
Fill Soap Buckets on DS & PS *
Close Gates from Digital Queue and Set to AUTO *
Walk-Thru Tunnel and Inspect ALL Hydraulic Hoses Feeding Into Motors on Equipment & Make Sure There Are No Hydraulic Leaks At Connections *
Using Your Hand, Check ALL Hydraulic Hose Connections to Motors on Equipment for Any Leaks *
Manually Extend DS & PS Wheel Brushes and Ensure Smooth Return to Home Position *
Manually Pull DS & PS Exit Wraps to Center and Release. Ensure Smooth Return to Home Position *
Manually Pull DS & PS Grill Brushes to Center and Release. Ensure Smooth Return to Home Position *
Manually Extend DS & PS Tire Shine Brushes and Ensure Smooth Return to Home Position *
Inspect ALL Wrap/Mitter Material for ANYTHING that Could Scratch A Vehicle *
Ensure Banana Foamers Are In Proper Position Angled Toward Center *
Press "WET DOWN" Button on Black Pedestal to Begin Wet Down of Equipment (Runs for 60 Seconds) *

Ghost Wash Process

Press "GHOST WASH" Button on Black Pedestal to Load into Queue *
Press "ROLLER UP" Button on Black Pedestal to Send Rollers *
Stand In Path of Eye to Fire Wash (Stay In Path Until Mitters Start Moving) *
Step on BLUE Tire Switch to Simulate Front Wheels and Activate CTA *
Step on BLUE Tire Switch to Simulate Rear Wheels and Activate CTA *
Walk Thru Tunnel At Pace of Equipment Activating and Ensure All Functions Are Working (CHECK BOX IF ANY OF THESE HAS ISSUES)) *